Features
Testimonials
Pricing
Community
844-994-7386
Login
Signup
Home
Features
Testimonials
Pricing
Community
Login
Features
Testimonials
Pricing
Community
844-994-7386
Community
Welcome
Q & A
Feature Requests
Bug Reports
Project Showcase
Humor & Memes
Blog
Product Updates
Inside Track
Help Center
Training Videos
Documentation
Jeffery Osborn
Community Profile
All
Posts
Comments
Revison Overlay
5d 23h
Perfect, thanks, so then I can takeoff on the old plan and then move it to the new one. Thanks Again!
Revison Overlay
5d 23h
So it appears this will take a while to implement, I was thinking, about cropping an outdated page as a new page, however, we cannot even crop an outdate page as a new page. Will allowing cropping ...
Viewing takeoff on outdated plans in Reports
6d 23h
No it only shows whats on an active sheet
Revison Overlay
7d 23h
How is this feature request coming along, this is a big item that we need to compare revisions. Thank You
Formula Error
7d 23h
And how do you do these GIF images, I tried and cannot get it to work
Formula Error
7d 23h
Will that work as a formula for a custom property? I have the formula to change in another custom property, Where is that additional info tab? Or is that a custom property?
Formula Error
8d 0h
That wont let me use it to calculate another formula: The yes/no only name option will not work in a formula: So there are 2 thing happening with this one custom property, I am using it for a name ...
Takeoff Tree View option
8d 10h
No I dont want to see any of the child ones under that takeoff (measured length) the ones in blue basically
Convert to Items
8d 18h
I wanted to a say a batch option, or selecting and right click and say convert to item
Custom Properties
8d 19h
Maybe additional Check box on the custom property page to apply to all selected items, it would default to be a plus sign and remove option like we use for adding measurement types, that custom lis...
Formula Bug?
8d 20h
I have it fixed now, I was confusing myself I divded 6 into 6... thats 1, instead of 6 into 4. Thanks
Formula Bug?
8d 20h
Looks like this wont allow a decimal value
Formula Bug?
8d 20h
([./# of CCTs/point count]/[CCTs per HR]) I did this and it return 1
Formula Bug?
8d 20h
Should be 1.5
Formula Bug?
8d 20h
This part of the formula is returning a 0 ([./# of CCTs]/[CCTs per HR])
Formula Bug?
8d 20h
Sorry there still is a slight issue: If I do the math on this: 42.10+20 = 62.1#of CCTs = 6CCTs per HR = 4 6/4=1.5 62.1 * 1.5 = 93.15, this then should round this up to 100, I even took out the if t...
Formula Bug?
8d 20h
I had to add ./ for the # of CCTs, then this works: if([./# of CCTs/qty] < [CCTs per HR],(sum('qty')+[Linear:FT]),((sum('qty')+[Linear:FT]))*([./# of CCTs/qty]/[CCTs per HR]))
Child Names from Parts of Parent Name
9d 0h
The custom properties work great. Thanks
Unit Prices and Multiply Takeoffs ALL in a Takeoff Property??
11d 19h
Thanks Todd!, So after talking with Todd, I had to make the floor core a child under that item
Unit Prices and Multiply Takeoffs ALL in a Takeoff Property??
11d 20h
Ok, I just want to get that point count to times by my multiplier
Unit Prices and Multiply Takeoffs ALL in a Takeoff Property??
11d 20h
going back on your other item, I have 2 field here, the count, and then the QTY (which is the footage that is needed per location) The footage part works fine as I need and times based on my number...
Unit Prices and Multiply Takeoffs ALL in a Takeoff Property??
11d 20h
The thing also is why does this have to be an item to multiply, this should multiply based on the parent vaule The green are items that multiplied and the Red is just a standard takeoff, anything...
Unit Prices and Multiply Takeoffs ALL in a Takeoff Property??
11d 20h
But you have that set to the QTY field, and what going to happen is that its going to take that and add that to my conduit and wire length, since my formula for my conduit total is taking the sum o...
Unit Prices and Multiply Takeoffs ALL in a Takeoff Property??
11d 20h
in this case its 2 for that run since the run has 2 conduit runs with floor core location at 1 spot, if that make sense
Unit Prices and Multiply Takeoffs ALL in a Takeoff Property??
11d 20h
So I have 2 things I am doing with that one count, I am figuring how much conduit & Wire I need, in addition I am figuring the number of cores through the floor are needed to get to a next floor level
Next