Project Showcase

Show off cool photos or screenshots of your work. Be sure you have proper permission to share.
Exterior Wall Assembly
2d 4h
I can't believe we can do this kind of stuff!
3 Replies
Deductive and Additive Alternate Switches in zzTakeoff
18d 6h
We have had a few users ask about deductive alternates in zzTakeoff, so I am hoping this video will help you along the way to building out your t...
Reply
Dynamic Margin-to-Markup Conversion
27d 1h
For those who prefer working in Margin instead of Markup, I’ve found a way to apply multiple adjustable margin rates directly through the Markup ...
4 Replies
metric: figured out a workaround to display width in mm in name using text with tags.
51d 2h
2 Replies
Completed
Boom Pump Hire – Minimum 4 Hours on Site "if" Formula from 5m³ to 200m³ concrete pour
78d 5h
Hi Everyone, Merry Christmas Guys! Created this formula which works perfectly for me with pump production rates for residential slabs and footin...
2 Replies
Test Server is awesome! Calculate Rebar and Rebar Labor together!
78d 5h
So happy about this! This was a missing piece in the puzzle for rebar estimating. In the new test server we are able to have a part within a part ...
1 Reply
Production Rate- Crew Hrs
97d 21h
Hello All, Here is an idea and way to calculate "crew hrs" using an "Item". I use this to figure out a crew hour rate to install a certain size ...
1 Reply
One way to view and takeoff Multiple pages
175d 23h
Stacking overlays up for takeoff alternative method (Watch your scale) -Add Blank Page 18x24 here. Stack Overlays or Use the Opaque overlay...
5 Replies
if Formula
181d 20h
Hello All, when building formulas using "if", I noticed that this needed to be the first expression in order for the formula to calculate correctl...
9 Replies
Concrete Takeoff
188d 2h
1 Reply
Landscape Takeoff
188d 19h
Reply
Framing Takeoff
188d 19h
Reply