Features
Testimonials
Pricing
Community
844-994-7386
Login
Signup
Home
Features
Testimonials
Pricing
Community
Login
Features
Testimonials
Pricing
Community
844-994-7386
Community
Welcome
Q & A
Feature Requests
Bug Reports
Project Showcase
Humor & Memes
Blog
Product Updates
Inside Track
Help Center
Training Videos
Documentation
Chris King
Community Profile
All
Posts
Comments
Unit Rates
8d 23h
I wanted to bump this up. This would be huge of us so we didnt have to do hard math LOL to figure out our unit rates
Copy takeoff with quantity's
8d 23h
I agree with Kevin — copy and paste. It would be helpful to have a "duplicate takeoff" button alongside it.For example, when pricing a VE option, you could copy an existing item and just change the...
3D Earthwork Tool, Asking for user input
9d 0h
Todd. Being a civil guy. I cannot stress enough the auto tracing Request plus you could implement it in other aspects of zz as well for linear or area takeoffs
Product list formula issue
9d 0h
I had an issue with cost codes and production rates getting wiped out everytime i changed the product. the fix was to make my cost code variable and production rate variable only apply to items and...
Updating the cost of a product will update its price on all items that it was applied to on the current project
9d 0h
if i am reading this correctly and i see it is planned when we change pricing in our product list it will change the price on all the items those products are associated with in all of our template...
Material price change - Best practice
63d 11h
It will update on any new takeoffs but not change any takeoffs previously done to when you changed your list if I am not mistaken
Unit Rates
65d 3h
sent
View Takeoff from Report
67d 1h
i believe you can open the same job in a different window tab and move it to your second screen or split view then see the other page or report whatever your trying to see
Option to remove to grouping outline in Excel export
72d 1h
We Love the Grouping.
Slow uploads
72d 1h
It has been super laggy on the takeoff side as well
Unit Rates
8d 23h
Can we please get this to calculate correctly if we change from a linear to a SF. Or a SF to a CY right now it stays on the takeoff type which doe...
4 Replies
Under Review
Layers change
73d 12h
That is good to know thanks
Layers change
65d 10h
we get an option to move a takeoff to a different layer. for instance we use layers for change orders and if we dont realize we are in the wro...
3 Replies
Under Review
Inherit function
74d 9h
I use a custom switch wich I call use in bid and default off with a fabric I use once in a while. I don’t know if that would work for you. I know it’s a little different usage but it results in a 0...
Drag and Drop Templates
78d 5h
I found out i just needed to copy and paste instead of Drag and Drop
Drag and Drop Templates
78d 5h
If i drag a new item from a different template it says it is invalid Link to video Recording 2026-04-03 073731.mp4
2 Replies
Under Review
Addresses
81d 13h
You guys are awesome
Change units?
81d 14h
Be careful in reports the Takeoff Price each does not change the to the NR it will still calculate it to the SF.for exam;oe we have some we wantt o get CY but because its an area takeoff it calcula...
Addresses
81d 12h
All the Addresses are deleted from all of our projects in the project folder.after the last update. I put a new address in and save. then go back...
4 Replies
Completed
Product Formulas
89d 7h
there is not any way to do that, that i know of
for anyone interested, I figured out a little hack to get some of my lists to sort in the order i wanted
91d 7h
Thanks for the info
Create Folders With the "Extract Schedule" Option
92d 8h
That would be awesome for those estimates that have bid schedules
Expand and Collapse Button (Incremental)
94d 5h
I would like it on the Reports and the Takeoff and Templates. But i dont use Pages that much as of right now
Project Export
95d 14h
Just the ability to still have it but not on the server. The glory i was talking about is the ZZ Projects and templates which I have so much better than when i was using PS.for example we just had ...
Project Export
95d 14h
Can we get a way to Zip a set of plans when we are done with it allowing us to delete it off our workspace and allowing us to reupload it if we ne...
2 Replies
Under Review
Next