Features
Trades
Testimonials
Pricing
Community
844-994-7386
Login
Signup
Home
Features
Trades
Testimonials
Pricing
Community
Login
Features
Trades
Testimonials
Pricing
Community
844-994-7386
Community
All Channels
Q & A
Feature Requests
Bug Reports
Developers / AI / MCP
Project Showcase
Humor & Memes
Plugins (Installed)
Integrations (In Progress)
Ediphi
BidBow
Google Drive
Google Sheets
Blog
Product Updates
Inside Track
Help Center
Training Videos
Documentation
Q & A
New Post
Got questions? This is the place to ask! Connect with other users and get the answers you need.
All Statuses
Planned
Under Review
In Progress
Completed
Closed
[No Status]
All
Planned
Under Review
In Progress
Completed
All Statuses
Planned
Under Review
In Progress
Completed
Closed
[No Status]
Dimensions
88d 13h
Is there a way to change dimensions from feet and inches to just inches?
1 Reply
temples
88d 18h
how I can use temples from zztakeoff
1 Reply
How do I copy-past my takeoffs In a new section like planswift?
89d 1h
Good afternoon. Im new to this estimate program, Ive recently switched from planswift and using ZZ for a new project. As of now Ive attempted to c...
4 Replies
Dimension Measures of [Length] and [Width] results in the area Takeoff for Rectangles (Box Mode)
89d 2h
Currently, for Rectangle Area takeoffs, the primary output displayed in reports and the "Measurements" list is the total Area (SF). While the Ar...
1 Reply
Under Review
Leveraging Beam Tool for Ductile Iron Pipe
89d 6h
Ductile iron pipe comes in 18ft lengths, and we only sell full sticks (contractors can cut to length). If I have three segments of 12" DIP: ...
6 Replies
Multiplier Solutions
90d 0h
Is there a solution for assigning multipliers at takeoff level yet? Can we select all items on a page and assign a multiplier yet? Thanks for any ...
1 Reply
Takeoff Multiplier
90d 0h
Need a takeoff multiplier so that we don't have to copy a takeoff multiple times to obtain the total takeoff amount.
13 Replies
Planned
Folders Report
90d 0h
Hey Team, Is it possible to move the folders in the reports tab? I do my takeoff in construction order, however in the reports tab, it is o...
2 Replies
Is there a way to swap default decimal point from comma to dot?
90d 7h
2 Replies
Circular Reference
90d 7h
I am trying to created a manually summed takeoff, which sums takeoffs from child takeoffs, and then use that summed value as the input for an item...
9 Replies
Cloning a layer
90d 19h
Is there a way to clone/duplicate everything (including all takeoff data) from one layer to another? I know you can copy & paste all takeoff o...
4 Replies
Completed
STUCCO
90d 23h
Any body has a stucco assembly system that may want to share?
4 Replies
Deduct quantity from one part from another within an assembly?
91d 1h
Is it possible to deduct a quantity from one part of an assembly from another part within the same assembly? For instance, I've created a footing...
3 Replies
Products breaking inheritance
91d 8h
Hey Team, I've set up product lists for my items, and they inherit a number of custom property variables from the parent. However whenever i ...
2 Replies
Duplicate Job Created, Any way to combine?
91d 21h
We received 2 sets of plans and mistakenly created and worked on duplicate jobs. Is there anyway to combine jobs or insert pages from another job ...
1 Reply
Duplicating a Folder
92d 4h
Testing a trial version of zz, planswift user. From my search it's not possible to copy and paste a folder with takeoffs and keep values like ...
3 Replies
Under Review
Job Number
92d 7h
Hey Team, Does ZZ have Job Numbers? or we have to include them in Job Name?
2 Replies
Angular Stripe Takeoff
94d 21h
I have a project that I need to takeoff the alternating lines as shown in the picture below. Is there a tool or a way to take off the stripes at t...
1 Reply
Safe documents
94d 21h
I have the demo and I want to make the purchase. I want to know if I can save the work I have in the demo first.
1 Reply
Splitting line items by finish level in reports for batch editing
94d 23h
I'm trying to get my reports to behave more like a high level spreadsheet for quick turnaround conceptual estimates, and I'm close but stuck on on...
3 Replies
Previous
Next