Hi All,
We made a sneak peak video for you to see what we are up to at zzTakeoff.
As we get closer to the release of this grading calculation tool, we are hoping to get some user input on what you would like to see as we move forward.
This plugin will be one of the free tools for our Ultimate subscribers.
There are two parts to this:
Both will be usable only inside of zzTakeoff and the plan is you will not have to leave to go to an external tool when using this. We will have a metric version as well.
Also, if you have a grading software, the results of the calculation and the set of grading plans and would like to share those with us, we would like to compare our results to yours. This way when we release it we have confidence in the numbers that this tool comes up with. Email todd@zztakeoff.com.
Currently there are some scripted takeoff tools, pipe templates with elevations for structures, invert, rim elevations and different trenching options.
This is not intended to compete with the 30 grand a year companies, but should be a great option to Earthworks Pro and Kubla Cubed.
Thanks!
Hi Todd,
You are making progress. I really like where it's heading. One thing I would ask is if you could vectorize the plans so you only have to grab the contour line once to place the elevations, instead of tracing. I'm also very interested in the underground utility option as one of my priorities with ZZ.
Hi Todd,
looks fantastic, it would be good to have an option for keeping working space separate for the likes drainage runs and reduce excavation quantities
Todd,
I'll skip the love comments and go right for the feedback so:
I'm a Agtek super user........(for dirt, not utilities)
1) PLEASE make the existing lines green by default and the proposed lines blue. I know Agtek thats the way, and believe Trimble does it too.
2) Need to auto-trace the contours and ability to quickly assign contours to elevation. Agtek has the F8 key that is my hero, that automatically increments the contors up or down so you can auto assign in a flash.
3) Do you understand the context of multiple surfaces? Agtek works on 4 primary surfaces, and its critical the volumes are calced from existing stripped vs proposed with subgrade adjustments.......... engineers always F it up and just give us volumes from existing vs proposed and try to do some monkey math to account for all the sections. (kind of like what you did with stripping)
MVP from a GC perspective I need:
1) Volumes broken out by any section/region/area we need.
2) Report that includes all area breakouts....heck just use agtek's report as a baseline as that thing is gold.
PS this is awesome!
Thanks Kyle, the line coloring is a good idea, I was going to change it to match the 3d contour lines. But I like idea to stick to an industry standard.
We will see what we can come up with on the other suggestions.
Steve Jobs yelled at me to post this here instead of the email I sent.
i. Show the user the pipe that is in a fill area versus a cut area.
Hi Spencer, that is awesome, I met with Chris from an excavation company in Georgia asking for the same information. I am working on it now, and it seems to be plausible, We will need a way of marrying it up to the earthwork tool.. it is a workin progress, but thank you for the input!
The rest of the group hit the major high points from my perspective. But somethings that i feel weren't covered.
Autotrace - All of your civils would love it, not sure if its feasible in web format. We get a ton of difference in plan quality that really CAD is second to none in my opinion on this topic.
Report Regions - being able to isolate cut and fill calculations as a subset of a larger region without applying sectional depths. This is very valuable when looking at any earthwork job.
Structural or Staged Excavations and Backfills - Footings/Structures/Abutments all things that need separate modeling typically with different scenarios shored, laid back at user defined slope to be able to calculate excavation and backfill requirements.
Some of these have been discussed in other posts above, and also in other questions/requests, but here are the highlights.
I doubt that I have them all, but those are the ones that are Top of Mind right now. Let me know what questions you have, and thanks for all you are doing!
Thank you all for the amazing input!,
I know as zzTakeoff evolves we will not doubt be able to take some of these great suggestions to task and I look forward to working on these when that time comes.
Until then we will all keep pushing pre-construction to the next level, where you all deserve to be!
Todd. Being a civil guy. I cannot stress enough the auto tracing Request plus you could implement it in other aspects of zz as well for linear or area takeoffs