Features
Testimonials
Pricing
Community
844-994-7386
Login
Signup
Home
Features
Testimonials
Pricing
Community
Login
Features
Testimonials
Pricing
Community
844-994-7386
Community
Welcome
Q & A
Feature Requests
Bug Reports
Project Showcase
Humor & Memes
Blog
Product Updates
Inside Track
Help Center
Training Videos
Documentation
Steve Golubov
Community Profile
All
Posts
Comments
Project Variable Climate Zone
70d 2h
Okay amigo, espero que esto ayude!You may have to change my temperatures on this formula if you can get a better info.This is a starter list with Tier 1 Cities. Then Tier 2 Cities like: City Boston...
Project Variable Climate Zone
70d 3h
Disregard the *1, *2 and so on. Change the number after the City to suit your Climate zone and put 1 into the Variables for that CityCopy and paste this and let me know.([City Miami]*1)+([City Hous...
Project Variable Climate Zone
70d 4h
I'm 100% sure that formula will not work. Is it working?
Project Variable Climate Zone
70d 4h
is that the full screenshot of the formula? Are you able to put the full screen if not
Project Variable Climate Zone
70d 5h
okay, I'm not sure then but you can trick it a bit and say have 7.001 and on the other one has (7)
Project Variable Climate Zone
70d 5h
Hi MiquelYou’re on the right track; you just need to follow the Value & Name structure. In your example, it’s currently set up the other way around.
Grid Tool, Joist Tool, and Beam Tool
71d 10h
Hi Heber,It would be best if both options were available.Keep beams/joists grouped by each area object for clear takeoff review and verification but also allow a totalled view for overall quantitie...
Option to remove to grouping outline in Excel export
72d 3h
A checkbox would be awesome, cheers!
Can the the new sum function feature be used to sum takeoffs to a manual takeoff?
73d 8h
@Heber,Thank you so much for the explanation.
Can the the new sum function feature be used to sum takeoffs to a manual takeoff?
73d 19h
Wrong Subject for my Question. I've tried to do sum('Cost Each') and it is not working for me
Get Labor Production to a Estimating Tool
75d 2h
As always, good question @Kyle! I’ve been working through the same thing. Still not sure if this answers your questions, I'm on my second drink :), still holydaying. One way I see it is to separate...
SKU Use Cases??
75d 2h
Hi @Kyle,Not using it yet, still working out how it fits into a real estimating workflow. If SKU is meant to standardise products and drive quantities & pricing consistently across jobs, I can see ...
Feature Idea: Global Estimate Adjustment by Dollar Value
75d 6h
That's a good news Kyle, thanks mate.
Feature Idea: Global Estimate Adjustment by Dollar Value
75d 6h
Hi All, Not sure if this feature was asked before, I have seen it in Sage Estimating, years back. This feature would be very useful in zzTakeoff...
2 Replies
Auto-Updating Estimates from Lists
77d 9h
Hi @Heber,This request is now 229 days old and remains a critical workflow requirement for many of us. The current workarounds add significant manual effort and introduce risk of inconsistent prici...
Hidden Properties Improvement
80d 5h
@Kyle,100% agree with you mate
Support for Multiple Takeoff Projects Within a Single Project
80d 8h
Hi Sam,Firstly, I’d like to say I really appreciate all the ongoing improvements being made to zzTakeoff, it’s clear a lot of effort is going into making it a powerful estimating tool. Similar as @...
Control Over Decimals and Rounding at Parent Level
81d 10h
@Stephen,Yes, it is under Qty, other ways it will come up with 2 decimal places.Concrete Edge Beam (EB) - [Linear]m L x [Width]m W x [Depth]0m D, Reinforced (3-TM12 Cage), Pumped.
Change units?
81d 22h
Change units?
81d 22h
Hi KevinI've learned this yesterday from Stephen. You need to change the units inside the Unit Box from EA to nr.First, change the Parent to Item. In the top right, click on the three-square blocks...
Control Over Decimals and Rounding at Parent Level
82d 8h
Hi Stephen,Thank you so much, that works for me to.Now we just need it to display the same value in the Name, Text with Tag as well. At the moment, it’s still showing 58.389 m instead of the rounde...
Is there a list of formula types available for zz
82d 19h
Hi Kevin,Try this formula([Segment count]*2)+if([Linear:m]<=2.4,0,floor([Linear:m]/2.4)-1) The formula counts 2 ends per segment, then adds the number of joints required based on 2.4m board lengths...
Control Over Decimals and Rounding at Parent Level
83d 7h
Hi Sam,Thanks again, good stuff, the round-up is working well following your instructions.The only issue I’m running into now is with the UOM. When I to enable the rounding, the unit switches from...
Control Over Decimals and Rounding at Parent Level
83d 9h
Thanks again Sam, much appreciated.I completely forgot about this feature, I’ve now updated it to show two decimal places.Looking forward to the roundup update when it’s available.
Control Over Decimals and Rounding at Parent Level
81d 10h
Hi Guys, Just a quick question, would it be possible to have more control over rounding and decimal display at the Parent level? Specifically: ...
8 Replies
Previous
Next