Features
Trades
Testimonials
Pricing
Community
844-994-7386
Login
Signup
Home
Features
Trades
Testimonials
Pricing
Community
Login
Features
Trades
Testimonials
Pricing
Community
844-994-7386
Community
All Channels
Q & A
Feature Requests
Bug Reports
Developers / AI / MCP
Project Showcase
Humor & Memes
Plugins (Installed)
Integrations (In Progress)
Ediphi
BidBow
Google Drive
Google Sheets
Blog
Product Updates
Inside Track
Help Center
Training Videos
Documentation
Q & A
New Post
Got questions? This is the place to ask! Connect with other users and get the answers you need.
All Statuses
Planned
Under Review
In Progress
Completed
Closed
[No Status]
All
Planned
Under Review
In Progress
Completed
All Statuses
Planned
Under Review
In Progress
Completed
Closed
[No Status]
Home Page / Dashboard When Opening Software
242d 11h
I'd like to suggest creating a home page, or dashboard view. when opening the software. For example, create a landing page that has a view that sh...
1 Reply
New Users Training Webinar- Tuesday at 9am Mountain Time
242d 17h
https://us06web.zoom.us/j/87669313357?pwd=e140Z5unxrbBQIEjiGCTaRpxIO7daE.1 Hi Everyone, Darin is restarting the new users webinar, if you a...
Reply
Hot links- or Similar
243d 13h
Is there a feature that replicates the hotlink function in OST? or something similar?
4 Replies
In Progress
Seeking help with takeoffs
244d 12h
Hi, is there a way to stop the rate from showing a total in the main takeoff row, so it doesn’t add up the rates? For example, if the board is £3 ...
Reply
Rebar Custom Properties/Nesting
245d 13h
What's going on guys? New user to zz here- met the guys at WOC and was impressed with the takeoff software. I'm a small business owner-operat...
1 Reply
Quick question about utilizing iOS web app.
245d 15h
On desktop it’s easy to refresh and know you’re on the latest version, but iOS home screen web apps seem to get stuck on cached files after an upd...
Reply
2 sides QTY in Takeoff
246d 5h
Would you be able to add the ability to add a multiplier value to the takeoff level. When we do 2 sides of a wall the takeoff is always 1 side but...
Reply
Cost to takeoff
246d 12h
Is there another way to add a cost to a takeoff item without using the labour section? In PlanSwift you can customise a column next to the item an...
Reply
Separate out takeoffs by area
248d 10h
I have a late request to separate my bid into 4 parts - basically parts of a plan. I've done the entire takeoff as one (ie., I need to separate o...
6 Replies
Stepped Retaining Walls
248d 17h
How are you handling stepped retaining walls if they are the same thickness walls?
3 Replies
Learning the Basics Webinar- Beginners to Intermediate user Q & A- Tuesdays 9:00AM Mtn. time
249d 15h
Hi everyone! My name is Darin Thomas and I will be hosting zzTakeoff's webinar every Tuesday at 9:00 AM MST to go over some of the incredible feat...
4 Replies
Can someone share an interior wall with metal studs, insulation and drywall assembly
249d 16h
I do not need your pricing, just the genius of building it would help a lot. I can then modify from there. Thanks in advance. Marc
19 Replies
Suggested New Feature
249d 16h
I used Blubeam in the past and I liked the feature of dragging to make a box while using the area tool, instead of having to click all four corner...
6 Replies
How Do I Rearrange Revision Sets
250d 8h
How do I make the most current set show up on top? I am manually layering them since this project was started prior to the update. I want version ...
1 Reply
Assemblies Import
251d 3h
Greeting to all. I have imported all of my Planswift assemblies and they have all come through with no sub-items. Is this the norm or have I done ...
3 Replies
Closing Out Jobs
251d 15h
Is there a way to separate jobs that are either lost or no longer active from my job list? It can get cumbersome scrolling through a long list and...
5 Replies
Material with labor together
252d 15h
How can I create a takeoff item that has both material and labor together?
3 Replies
Footing Rebar
252d 18h
Anyone have a rebar formula for footings that includes overlap and ultimately gives you total lbs?
2 Replies
How to Calculate Quantities for 4"-8"-12" Variegated Metal Panels
253d 8h
Hi guys, I am working with variegated metal panels where the pattern is consistent across the wall. The panels repeat in this sequence: 4" + 8" +...
4 Replies
Help with Formulas
253d 15h
Hi there, I've watched a bunch of tutorials and read the transversal logic operators. But I'm pretty new to formula creation and hoping someo...