Back to zzTakeoff Community Channel LogoFeature Requests

Merge Two Jobs

Under Review

I was wondering if the system can merge jobs together.

0

Hey John, we don't have this built in yet, but if the plans exist in both projects, you could open 2 tabs, and copy/paste the takeoffs between. One downside is that for each copy/paste between projects, it will create a new takeoff per page, so you may need to go through and convert the sections to a centralized takeoff.

You must be logged in to post replies. If you don't have an account you can signup here.