We would like the ability to change 100% of a condition's takeoff to a different condition. Currently, zz allows you to Convert one instance of a condition on a page-by-page basis. This is great, but we also want the ability to Convert ALL of a condition's takeoff at once. We want zz to add a feature similar to OST's "Reassign Objects" function. Ideally, this new feature would be available by right clicking on a Takeoff condition.

3

Hi Adam! Thanks for posting here. I can see how this would be really useful. We will make sure this is included in the upcoming release.

Hi excited for the upcoming feature! but I am struggling to understand the request, can someone explain it to me? I’ve never used OST

Awesome! Thanks Heber!

@Luke,

If I understand correctly, what is being requested is essentially a “Replace All” function for takeoff conditions.

Right now in ZZTakeoff, if you accidentally used the wrong condition/item, you can only convert it one page at a time.

Example:

You did takeoff using:

  • “100mm Slab – SL82 wire mesh”

But later realise it should have been:

  • “125mm Slab – SL92 wire mesh”

At the moment, ZZ lets you convert/change it page by page only.

So if that condition exists on:

  • Page 1
  • Page 2
  • Page 3
  • Page 10

you have to manually convert each page separately.

What is requested:

  • Right click the condition
  • Choose something like “Convert All” or “Reassign Objects”
  • Select the new condition
  • ZZ changes EVERY takeoff tied to that condition across the whole project automatically

So:

ALL “100mm Slab – SL82”

becomes

ALL “125mm Slab – SL92”

without losing the measured quantities.

When the mentioning of OST “Reassign Objects”, they are referring to On-Screen Takeoff functionality where you can globally reassign all takeoff objects from one condition to another in one action.

This would be extremely useful in ZZTakeoff if:

  • you picked the wrong assembly
  • changed slab thickness
  • changed reinforcement type
  • changed concrete strength
  • renamed scopes
  • duplicated a condition incorrectly
  • imported wrong templates

Instead of redoing takeoff or converting page by page, it would update the whole project at once.

Hope I explained correctly, cheers!